Six projects, with the numbers owners ask for.

Size, value, delivery method, schedule result. References are in the capabilities packet and we will put you in touch.

Construction workers in hard hats and safety vests on site

Representative photo

Ground-up healthcare · 2025

Gilbert Medical Office Building

Size48,000 sq ft, 3 storiesScopeDesign-build; structural steel; ASC on the ground floor; medical office above; $21MFora healthcare developer

A three-story medical office building with a surgery center on the ground floor, delivered design-build with our architecture partner. GMP set at DD, final cost 1.8% under. Substantial completion three weeks ahead of the lease date; the ASC passed ADHS inspection first time.

A crane lifting a building

Representative photo

Multifamily · 2024

Tempe Podium Residences

Size240 units, 5 over 2ScopeCM at risk; post-tensioned podium, wood frame above; $58MFora multifamily developer

Our largest project to date: 240 units of wood frame over a two-level post-tensioned podium on a tight downtown Tempe site. Logistics plan with a single crane and a half-street closure. Delivered on the contract date; final cost 2.4% under GMP.

People working on building during daytime

Representative photo

Tenant improvement · 2023–2025

Camelback Tower Spec Suites

Size14 suites, 86,000 sq ftScopeUnit-price agreement; spec suites and common-area refresh in an occupied Class A towerForthe landlord

A standing unit-price agreement with a Camelback corridor landlord. Fourteen spec suites and two floors of common-area refresh over three years, all after-hours, no tenant complaints logged. New suites released without a new bid.

Man in red blue and white plaid dress shirt wearing yellow hat holding black smartphone

Representative photo

Healthcare TI · 2024

Tucson Surgery Center

Size18,000 sq ft, 4 ORsScopeGeneral contract; ASC build-out in a shell; medical gas, pressure relationships, ADHS licensingFora physician group

A four-OR ambulatory surgery center in a new shell, run from our Tucson office with Tucson subs. Medical gas verified with zero corrections; ADHS licensing survey passed first visit; opened on the date the physician group had been telling patients for a year.

Man in grey jacket and yellow hard hat standing on orange metal ladder

Representative photo

Industrial · 2023

West Valley Distribution Center

Size312,000 sq ftScopeDesign-build; tilt-up concrete; 36-foot clear; 60 dock doors; $29MForan industrial developer

A speculative distribution building in Goodyear: tilt-up panels cast and raised in seven weeks, roof on by month five, shell complete in nine months. Leased before completion; the tenant's TI followed under a second contract.

A man in overalls holding a hard hat

Representative photo

Healthcare · 2024

Flagstaff Clinic Expansion

Size22,000 sq ft additionScopeCM at risk; addition to an occupied clinic; winter schedule; ICRA phasing; $12MFora northern Arizona health system

An addition to an operating clinic in Flagstaff, foundations in before the first freeze and the envelope closed by November. Phased under ICRA so the clinic never closed. Delivered in the spring on the contract date.

Next step

Have a project like one of these?

A project executive replies the same business day. Conceptual estimates within two weeks of the information we need.